The packet arrives incomplete
Leaders are asked to approve a slogan, a date, and a preferred vendor. The current process is still missing.
IT project approval process
An IT project approval process records a yes, no, or not yet on a complete software request that already has both estimates. A steering committee without that record is a conversation. Capacity is spent by the written decision.
For leaders and reviewers who need a written decision on software demand—without hiring a project office to run the meeting.

A working IT project approval process produces
A steering committee can talk for an hour and still leave capacity unassigned. If the decision is not on the request, the process did not run. A phase gate that only checks a packet is the same failure with a calendar invite.
Leaders are asked to approve a slogan, a date, and a preferred vendor. The current process is still missing.
IT sized the build. Training and adoption are “later.” The yes funds a half-plan.
A nod in a meeting spends capacity. Nobody can find the decision when QA starts.
Approval is the last intake job, not the first planning job. Finish the request, finish both estimates, then write the decision on that record.
Approval starts after the request exists. Finish software project intake before anyone books the steering committee.
The questions that change the yes live on requirements gathering software so leaders are not voting on a slogan.
If a stranger cannot retell the problem, people, owner, and limits, there is nothing to approve.
Send the request back with the missing answers named. Do not schedule approval to finish intake.
Business effort and technical effort sit on the same record before anyone votes.
A code-only quote is not ready for approval. A training-only wish is not ready either.
The decision cites the request and both numbers. Not-yet keeps the story without spending capacity.
A no is a success of the process. A hallway yes is how the process dies.
Later requirements, the board, and QA open the same record the leader signed.
If testers cannot find the yes, you approved a meeting, not a software change.
Approved work keeps the request and both estimates. A new charter is how two truths start.
The next job is questions and delivery planning on that thread—not another deck for a kickoff.
Practical template
Use this as the written gate. If a step happens only in the room, it is not yet a process.
IT project approval process checklist
Why it exists
Leaders should not reconstruct the week in the meeting.
Done looks like
A stranger can name the problem, people, owner, and limits.
Why it exists
Training and adoption are part of the investment.
Done looks like
Hours and a loaded rate sit on the request.
Why it exists
The build is the other half of the same decision.
Done looks like
Build, integrations, and cutover with assumptions.
Why it exists
Capacity is spent by a record, not a nod.
Done looks like
Yes / no / not yet dated on that request.
Why it exists
A committee without a name is not accountable.
Done looks like
The VP who can spend the pair signed the line.
Why it exists
QA will need the same yes later.
Done looks like
The decision is still attached when testing starts.
| Check | Why it exists | Done looks like |
|---|---|---|
| Complete request | Leaders should not reconstruct the week in the meeting. | A stranger can name the problem, people, owner, and limits. |
| Business estimate | Training and adoption are part of the investment. | Hours and a loaded rate sit on the request. |
| IT estimate | The build is the other half of the same decision. | Build, integrations, and cutover with assumptions. |
| Written decision | Capacity is spent by a record, not a nod. | Yes / no / not yet dated on that request. |
| Named decider | A committee without a name is not accountable. | The VP who can spend the pair signed the line. |
| Thread preserved | QA will need the same yes later. | The decision is still attached when testing starts. |
Worked example
A facilities change had a six-week IT estimate and no training number. The process recorded not-yet instead of a hallway go-ahead.
An approval that waited on the missing half
What we recorded
Replace clipboard sign-in at two buildings
What we recorded
Current process, owner, and busy-season limit written
What we recorded
Badge integration and weekend cutover
What we recorded
Missing—front-desk training not sized
What we recorded
Not yet. Return when the people cost exists.
What we recorded
Operations VP, dated on the request
What we recorded
Approve the build and “figure out training later”
| Check | What we recorded |
|---|---|
| Request | Replace clipboard sign-in at two buildings |
| Completeness | Current process, owner, and busy-season limit written |
| IT estimate | Badge integration and weekend cutover |
| Business estimate | Missing—front-desk training not sized |
| Decision | Not yet. Return when the people cost exists. |
| Decider | Operations VP, dated on the request |
| What we did not do | Approve the build and “figure out training later” |
The process succeeded when the missing half blocked the yes. That is cheaper than discovering training after cutover.
A phase gate versus an IT project approval process
Written IT project approval process
A complete request that already survived review
Written IT project approval process
Business and IT numbers on the same record
Written IT project approval process
A dated yes, no, or not yet on the request
Written IT project approval process
A decision that QA can still open
| Steering-committee theater | Written IT project approval process |
|---|---|
| A packet assembled the night before the meeting | A complete request that already survived review |
| One estimate in the slides | Business and IT numbers on the same record |
| A nod that nobody can find later | A dated yes, no, or not yet on the request |
| A phase gate that checks a date | A decision that QA can still open |
A committee cannot write the request. If the story does not exist before the meeting, the meeting is intake.
A launch date is not a plan and not a yes. The decision cites both estimates, not a calendar.
If work starts before the record exists, you do not have a process. You have a rumor.
An email “approved” that testers cannot find is how two sources of truth start.
In Precision Foundry
The method above is operational: refuse incomplete demand, require both estimates, write the decision. Precision Foundry keeps that yes on the same thread later testing still opens.
Common questions
An IT project approval process records yes, no, or not yet on a complete software request that already has a business estimate and an IT estimate. The decision stays on that record.
A named leader who can spend both totals. A committee can advise. A hallway nod is not approval.
When a stranger can retell the story and both estimates exist with assumptions. If either side is missing, the process records not-yet.
No. A phase gate often checks a date or a packet. This process checks a complete request, paired estimates, and a written decision.
The approved request keeps its story and numbers. Questions, delivery planning, and QA open that same thread. Planning does not invent a new document.
Precision Foundry keeps this guide attached to the request so the template does not live in a forgotten doc.